From 0d6846f55e997f98167fee0532d381a1c5762252 Mon Sep 17 00:00:00 2001 From: Danila Fedorin Date: Fri, 6 Dec 2019 21:23:02 -0800 Subject: [PATCH] Fix typos --- retrospective.tex | 8 ++++---- 1 file changed, 4 insertions(+), 4 deletions(-) diff --git a/retrospective.tex b/retrospective.tex index 2491deb..57db686 100644 --- a/retrospective.tex +++ b/retrospective.tex @@ -188,7 +188,7 @@ research that the team will present to the client in the meeting. \subsection{Week 6} The highlight of this week was the first meeting with the client. This meeting was scheduled last-minute, but went very well. The team's plan and the client's -expectations were not significantly different. To accomodate the team and +expectations were not significantly different. To accommodate the team and the client's busy schedule, meetings were agreed to be bi-weekly, and made optional (to prevent wasted time in the event that no new information is required by the group). During this week, team members wanted to begin @@ -208,7 +208,7 @@ in the second draft. The first draft was submitted on time and with no other iss Since the team was busy with the creation of the design (and the design document), the issue of funding was not significant at this time. The group member responsible -for the hardware simulated some of the components of the initial design, in order +for the hardware simulated some components of the initial design, in order to explore the implementation of the project. However, no significant insight was gained from this, with the exception of familiarity with the tooling. @@ -224,11 +224,11 @@ of the document, which were promptly corrected. At this point, the document was complete with the exception of UML diagrams, which were scheduled to be inserted during the weekened. Other than the medical emergency and the design document, no significant problems -or progress occured this week. +or progress occurred this week. \subsection{Week 9} This was a short week which ended in Thanksgiving, and no significant changes -to the state of the project occured at this time. The team submitted all the +to the state of the project occurred at this time. The team submitted all the generated documentation to the client / advisor, but did not receive a response during this week. No issues were encountered during this time.