\section{Retrospective}
|
||||
% TODO add retrospective
|
||||
% positives column: anything good that happened
|
||||
@ -252,59 +253,79 @@ responsibility for parts of each assignment.
|
||||
\begin{parcolumns}[colwidths={1=0.3\textwidth}]{3}
|
||||
\colchunk{
|
||||
\subsection{Positives}
|
||||
\emph{Week 3} This week included full completion of the requirements document rough draft and we began merging our problem statements. The requirements document is very near
|
||||
\emph{Week 3:} This week included full completion of the requirements document rough draft and we began merging our problem statements.
|
||||
The requirements document is very near
|
||||
complete and we anticipate very little additional work to finish. Our team
|
||||
reports good division of labour, and initial communication with client
|
||||
went well.
|
||||
|
||||
\emph{Week 4} Good work has been put into researching the specific
|
||||
\emph{Week 4:} Good work has been put into researching the specific
|
||||
hardware we will need for our project. Specifics into the protocol
|
||||
and communication between modules has been decided on well prior
|
||||
to the design document. Professor Hamdaoui is aware of our progress
|
||||
and mentioned we are ready for funding. Lastly, we have completed
|
||||
the requirements document and are pleased with our work on it.
|
||||
|
||||
\emph{Week 5} All team members have completed their tech reviews
|
||||
\emph{Week 5:} All team members have completed their tech reviews
|
||||
with no problems to report. Our team met with our client, who was
|
||||
pleased with our work so far and continued to mention funding, and
|
||||
asked for some form of presentation in regards to our hardware
|
||||
decisions.
|
||||
|
||||
\emph{Week 6} A biweekly meeting has been setup with our client
|
||||
\emph{Week 6:} A biweekly meeting has been setup with our client
|
||||
to discuss current status. All tech reviews have been completed,
|
||||
and the meeting with our client went very well, with plans to talk
|
||||
more in the future.
|
||||
|
||||
\emph{Week 7} Design document has been fully completed and
|
||||
\emph{Week 7:} Design document has been fully completed and
|
||||
submitted, fully packed with specific information on how we will
|
||||
complete our project.
|
||||
|
||||
\emph{Week 8} Design document has been sent to our client for
|
||||
\emph{Week 8:} Design document has been sent to our client for
|
||||
review. We are one step closer to funding as the question has been
|
||||
posed to both our TA and the professors.
|
||||
|
||||
\emph{Week 9} We culminated our finalized work and sent it to our
|
||||
\emph{Week 9:} We culminated our finalized work and sent it to our
|
||||
client for review.
|
||||
|
||||
\emph{Week 10} We met with our client in regards to our submitted
|
||||
\emph{Week 10:} We met with our client in regards to our submitted
|
||||
documents. Our client, Professor Hamdaoui, was really receptive to
|
||||
our work and is excited for us to get our hands on the hardware in
|
||||
order to begin the actual project.
|
||||
}
|
||||
}
|
||||
\colchunk{
|
||||
\subsection{Deltas}
|
||||
|
||||
Eventually the project will need to be funded in order to get the hardware that is needed to prototype
|
||||
the device that is the focus of this project.
|
||||
The product still needs to acquire funding from Senior Capstone. Collars make up a big part of the
|
||||
Fenceless Grazing System, which are entirely implemented using embedded hardware, and the client
|
||||
wants to have a functioning collar prototype by the end of the year. As such, funding is needed
|
||||
to purchase components for the collars, as well as for the API server that will power the Android
|
||||
application component of the project.
|
||||
|
||||
Document requirements need to be more thoroughly processed such that they satisfy all requirements as are appropriate.
|
||||
The team must do a better job of understanding the CS46x-specific requirements for each document. Quite some
|
||||
points were lost on the assignments, in ways that were not anticipated.
|
||||
|
||||
Across the team tasks need to be more evenly distributed and properly managed such that deadlines can be met in a more efficient manner.
|
||||
The team must change the means of distributing tasks. The method used in this term,
|
||||
which was heavily based on individual initiative, led to an improper distribution of
|
||||
work and time.
|
||||
}
|
||||
\colchunk{
|
||||
\subsection{Actions}
|
||||
In order to secure funding, we will directly reach out to Dr. Winters at the beginning
|
||||
of the next term.
|
||||
|
||||
Add some text
|
||||
To address the issue of misunderstood assignments, the team will aim to complete
|
||||
them a week before they are due, when possible. This way, an individual appointment
|
||||
can be scheduled with Dr. Winters, and feedback can be acquired on existing drafts.
|
||||
In order to make sure that the assignments are done a week before they are due,
|
||||
the new work-mangement system (described below) will be used.
|
||||
|
||||
The poor distribution of work will be solved by using task-management software, and
|
||||
assigning team members to individual tasks. The team anticipates using Trello
|
||||
for this purpose (or alternatively GitHub projects). A team member will be chosen
|
||||
to assign and manage tasks. This way, a specific person will be responsible for
|
||||
assigning tasks, rather than relying on initiative like was done before. Assigning
|
||||
team members to individual task will serve the same purpose.
|
||||
}
|
||||
\end{parcolumns}
|
||||