@ -76,7 +76,7 @@ purpose is to reduce the amount of manual labor required for herding
|
||||||
large numbers of livestock. The system does so by placing GPS-equipped
|
large numbers of livestock. The system does so by placing GPS-equipped
|
||||||
collars onto individual animals, and producing a negative stimulus
|
collars onto individual animals, and producing a negative stimulus
|
||||||
(either auditory or electrical) to discourage the animals from leaving
|
(either auditory or electrical) to discourage the animals from leaving
|
||||||
user-configured grazing areas. The goal of the project is to
|
user-configured grazing areas. The goal of this project is to
|
||||||
provide a reliable, cost-effective, and accessible replacement
|
provide a reliable, cost-effective, and accessible replacement
|
||||||
for manual farmer labor.
|
for manual farmer labor.
|
||||||
|
|
||||||
|
@ -107,31 +107,31 @@ this did not prove to be a significant blocker for our work, it did result in so
|
||||||
clarification recently with our client in regards to our vision on how we planned to move forward.
|
clarification recently with our client in regards to our vision on how we planned to move forward.
|
||||||
We plan on fixing this problem by scheduling a biweekly meeting with our client at the beginning
|
We plan on fixing this problem by scheduling a biweekly meeting with our client at the beginning
|
||||||
of next term. The best way to ensure that our team can keep our client up to date is to have a
|
of next term. The best way to ensure that our team can keep our client up to date is to have a
|
||||||
definite meeting time, and the best way to schedule this meeting would be as soon as all class
|
definite meeting time, where this meeting time would depend on the finalization of all of our
|
||||||
schedules have been finalized.
|
class schedules.
|
||||||
|
|
||||||
Another problem we encountered was lack of funding. While this was not an issue at the
|
Another problem we encountered was lack of funding. While this was not an issue at the
|
||||||
beginning of the term, it is looking to be a serious blocker in the near future as our next step
|
beginning of this term, it is looking to be a serious blocker in the near future as our next step
|
||||||
the moment we get back from winter break is to purchase hardware. Ideally, this hardware would be
|
the moment we get back from winter break is to purchase hardware. Ideally, we would make our purchases
|
||||||
purchased prior to even returning to school to allow our team to start work on the physical
|
prior to our return to school, which would allow the team to start work on the hardware
|
||||||
aspect of our project immediately. Our client has approved our hardware proposal, which was the
|
portion of our project immediately. Our client has approved our hardware proposal, which was the
|
||||||
last step before purchasing. Our team has discussed this funding with our TA, who in turn has
|
last step before purchasing. As a team we have discussed this funding with our assigned TA, who
|
||||||
brought it up to Professors Winters and Fairbanks. In an effort to ensure funding will be secured
|
in turn has brought it up to Professors Winters and Fairbanks. In an effort to ensure funding
|
||||||
as soon as possible, we will continue to follow up with our TA and the professors if necessary.
|
will be secured as soon as possible, we will continue to follow up with our TA and instructors if necessary.
|
||||||
|
|
||||||
Our last small problem we came across was in regards to formatting for our different submissions.
|
Our last small problem we came across was in regards to formatting for our different submissions.
|
||||||
One of our documents was incorrectly formatted as a result of our misunderstanding of the
|
Due to our misunderstanding of the provided requirements, we did incorrectly format one of our documents.
|
||||||
requirements. Also, towards the beginning of the term we named our files incorrectly, resulting
|
Also, towards the beginning of the term we named our files incorrectly, resulting
|
||||||
in the loss of points. In order to ensure that all style guidelines are met in the future, we
|
in the loss of points. In order to ensure that all style guidelines are met in the future, we
|
||||||
will communicate with our TA, other students, and our professors as needed. Prior to asking
|
will communicate with our TA, other students, and our professors as needed. Prior to asking
|
||||||
others, we will peruse the online documents provided to us on Canvas to ensure that we are
|
others, we will peruse the online documents, modules, and extra links provided to us on Canvas to ensure
|
||||||
not asking questions that have already been answered.
|
that we are not asking questions that have already been answered.
|
||||||
|
|
||||||
\section{Weekly Progress}
|
\section{Weekly Progress}
|
||||||
% TODO The document should include a detailed, week-by-week summary of activities,
|
% TODO The document should include a detailed, week-by-week summary of activities,
|
||||||
% problems, solutions, and the like (consider using your blogs to inform this report).
|
% problems, solutions, and the like (consider using your blogs to inform this report).
|
||||||
% The report should not include more than a summary of any bigger documents you produced
|
% The report should not include more than a summary of any bigger documents you produced
|
||||||
This section contains the summary of each week of the Fall term during which the
|
This section provides weekly summaries for every week of our Fall 2019 term for which the
|
||||||
project was active.
|
project was active.
|
||||||
|
|
||||||
\subsection{Week 3}
|
\subsection{Week 3}
|
||||||
|
@ -140,17 +140,20 @@ of drafting, submitting, and merging
|
||||||
the requirements document and problem statements. This went smoothly; each team member
|
the requirements document and problem statements. This went smoothly; each team member
|
||||||
felt confident in their understanding of the project's requirements and the
|
felt confident in their understanding of the project's requirements and the
|
||||||
problem it is solving, likely because our group was offered the project in
|
problem it is solving, likely because our group was offered the project in
|
||||||
the summer before the class had started. The only foreseeable problems at
|
the summer before classes had started.
|
||||||
this point is the difficulty in scheduling a semi-regular meeting with the
|
|
||||||
client: each group member, and the client themselves, are exceptionally
|
The main problem that we expect to see again in the future is our difficulty in scheduling a
|
||||||
busy during this academic term, and on most week, no single time works
|
semi-regular meeting with the client: each group member, including the client themselves, are
|
||||||
for every person. This problem is not significant at this point, however,
|
all exceptionally busy during a given academic term, and for most weeks there is no single time
|
||||||
|
at which we can all be present for a meeting.
|
||||||
|
|
||||||
|
This problem is not significant at this point, however,
|
||||||
because the team has enough information to work for the time being.
|
because the team has enough information to work for the time being.
|
||||||
|
|
||||||
\emph{Note: At this point, some members of the team received lower scores
|
\emph{Note: At this point, some members of the team received lower scores
|
||||||
than expected for certain submissions. Since the content of the various
|
than expected for certain submissions. Since the content of the various
|
||||||
submissions was agreed upon by each team member, the variance in
|
submissions was agreed upon by each team member, the variance in
|
||||||
the received scores was unexpected and was listed as a "problem". However,
|
the received scores was unexpected and has been listed as a "problem". However,
|
||||||
this did not impact the project itself, since one of the submissions
|
this did not impact the project itself, since one of the submissions
|
||||||
received full points.}
|
received full points.}
|
||||||
|
|
||||||
|
@ -175,8 +178,8 @@ The team's TA was asked about this, but was not aware of the details, and
|
||||||
offered to contact Dr. Winters.
|
offered to contact Dr. Winters.
|
||||||
|
|
||||||
While there is not yet an exact date for a meeting with the client, one
|
While there is not yet an exact date for a meeting with the client, one
|
||||||
is soon to be established. Each group member and the client provided the
|
is soon to be established. Each group member and the client have provided
|
||||||
times during which they are available, revealing that there were no
|
times for which they are available, revealing that there were no
|
||||||
time slots during which each individual was available to meet. As such,
|
time slots during which each individual was available to meet. As such,
|
||||||
one of the group members will likely skip this meeting, and the rest
|
one of the group members will likely skip this meeting, and the rest
|
||||||
of the group members will fill them in.
|
of the group members will fill them in.
|
||||||
|
@ -211,7 +214,7 @@ Since the team was busy with the creation of the design (and the design document
|
||||||
the issue of funding was not significant at this time. The group member responsible
|
the issue of funding was not significant at this time. The group member responsible
|
||||||
for the hardware simulated some components of the initial design, in order
|
for the hardware simulated some components of the initial design, in order
|
||||||
to explore the implementation of the project. However, no significant insight
|
to explore the implementation of the project. However, no significant insight
|
||||||
was gained from this, with the exception of familiarity with the tooling.
|
was gained from this, aside from familiarity with the chosen tooling.
|
||||||
|
|
||||||
\subsection{Week 8}
|
\subsection{Week 8}
|
||||||
In this week, the design document was completely transitioned to IEEE 1016-2009 format.
|
In this week, the design document was completely transitioned to IEEE 1016-2009 format.
|
||||||
|
@ -222,8 +225,8 @@ Despite the difficulties, the assignment was completed before the initial deadli
|
||||||
was later postponed), and the team had a chance to verify the content of the design document
|
was later postponed), and the team had a chance to verify the content of the design document
|
||||||
with the course's instructors. This helped discover several minor issues with the format
|
with the course's instructors. This helped discover several minor issues with the format
|
||||||
of the document, which were promptly corrected. At this point, the document was
|
of the document, which were promptly corrected. At this point, the document was
|
||||||
complete with the exception of UML diagrams, which were scheduled to be inserted
|
complete however did not include any UML diagrams, which were scheduled to be inserted
|
||||||
during the weekened.
|
over the coming weekened.
|
||||||
Other than the medical emergency and the design document, no significant problems
|
Other than the medical emergency and the design document, no significant problems
|
||||||
or progress occurred this week.
|
or progress occurred this week.
|
||||||
|
|
||||||
|
@ -234,11 +237,11 @@ generated documentation to the client / advisor, but did not receive a
|
||||||
response during this week. No issues were encountered during this time.
|
response during this week. No issues were encountered during this time.
|
||||||
|
|
||||||
\subsection{Week 10}
|
\subsection{Week 10}
|
||||||
The entire team, as well as the client, had a chance to meet and discuss
|
The entire team, including the client, had a chance to meet and discuss
|
||||||
the submitted documents this week. The client was very satisfied with the results,
|
the submitted documents this week. The client was very satisfied with the results,
|
||||||
but wanted a high-level overview of the system that was not "scattered through
|
but wanted a high-level overview of the system that was not "scattered through
|
||||||
a big document".
|
a big document".
|
||||||
On the team level, a new system was introduced to help evenly distribute workload
|
At the team level, a new system was introduced to help evenly distribute workload
|
||||||
among team members. A Trello-style board will be used to plan for the tasks
|
among team members. A Trello-style board will be used to plan for the tasks
|
||||||
ahead and assign work to members, so that there is a larger degree of personal
|
ahead and assign work to members, so that there is a larger degree of personal
|
||||||
responsibility for parts of each assignment.
|
responsibility for parts of each assignment.
|
||||||
|
|