initial columns
This commit is contained in:
parent
dea9ee0e4b
commit
cf2d81e586
217
retrospective.tex
Normal file
217
retrospective.tex
Normal file
@ -0,0 +1,217 @@
|
||||
\documentclass[10pt, draftclsnofoot,onecolumn, compsoc]{IEEEtran}
|
||||
|
||||
\def\changemargin#1#2{\list{}{\rightmargin#2\leftmargin#1}\item[]}
|
||||
\let\endchangemargin=\endlist
|
||||
|
||||
\usepackage{textcomp}
|
||||
\usepackage{todonotes}
|
||||
\usepackage{caption}
|
||||
\usepackage{pgfgantt}
|
||||
\usepackage{setspace}
|
||||
\linespread{1}
|
||||
|
||||
\def \CapstoneTeamName{Automated Fenceless Grazing}
|
||||
\def \CapstoneTeamNumber{CS3}
|
||||
\def \GroupMemberOne{Ryan Alder}
|
||||
\def \GroupMemberTwo{Danila Fedorin}
|
||||
\def \GroupMemberThree{Matthew Sessions}
|
||||
\def \CapstoneProjectName{Automated Fenceless Grazing}
|
||||
\def \CapstoneSponsorCompany{Oregon State University}
|
||||
\def \CapstoneSponsorPerson{Bechir Hamdaoui}
|
||||
\def \DocType{Retrospective}
|
||||
|
||||
\newcommand{\NameSigPair}[1]{\par
|
||||
\makebox[2.75in][r]{#1} \hfil \makebox[3.25in]{\makebox[2.25in]{\hrulefill} \hfill \makebox[.75in]{\hrulefill}}
|
||||
\par\vspace{-12pt} \textit{\tiny\noindent
|
||||
\makebox[2.75in]{} \hfil \makebox[3.25in]{\makebox[2.25in][r]{Signature} \hfill \makebox[.75in][r]{Date}}}}
|
||||
|
||||
\begin{document}
|
||||
|
||||
\begin{titlepage}
|
||||
\pagenumbering{gobble}
|
||||
\begin{singlespace}
|
||||
% 4. If you have a logo, use this includegraphics command to put it on the coversheet.
|
||||
%\includegraphics[height=4cm]{CompanyLogo}
|
||||
\par\vspace{.2in}
|
||||
\centering
|
||||
\scshape{
|
||||
\huge CS Capstone \DocType \par
|
||||
{\large\today}\par
|
||||
\vspace{.5in}
|
||||
\textbf{\Huge\CapstoneProjectName}\par
|
||||
\vfill
|
||||
{\large Prepared for}\par
|
||||
\Huge \CapstoneSponsorCompany\par
|
||||
\vspace{5pt}
|
||||
{\large Prepared by }\par
|
||||
Group\CapstoneTeamNumber\par
|
||||
% 5. comment out the line below this one if you do not wish to name your team
|
||||
\CapstoneTeamName\par
|
||||
\vspace{25pt}
|
||||
}
|
||||
\begin{abstract}
|
||||
The Fenceless Grazing Collar system aims to reduce the amount of work
|
||||
needed by farmers to keep herds of grazing animals. The project
|
||||
will be implemented using the LoRa wireless communication protocol to allow
|
||||
for long-range interaction between animal-worn collars and a gateway device.
|
||||
The gateway device will also provide an HTTP-based JSON API to apply configuration
|
||||
changes to collars through an application built for Android mobile devices.
|
||||
The MariaDB SQL database management system will be used to store the data
|
||||
received from the collar for viewing and analysis.
|
||||
\end{abstract}
|
||||
\end{singlespace}
|
||||
\end{titlepage}
|
||||
|
||||
\pagebreak
|
||||
\tableofcontents
|
||||
|
||||
\pagebreak
|
||||
|
||||
\section{Introduction}
|
||||
% TODO briefly recap the project purposes and goals
|
||||
This document describes the current state, problems, and future
|
||||
plans of the Fenceless Grazing Collars project. The FGC system's
|
||||
purpose is to reduce the amount of manual labor required for herding
|
||||
large numbers of livestock. The system does so by placing GPS-equipped
|
||||
collars onto individual animals, and producing a negative stimulus
|
||||
(either auditory or electrical) to discourage the animals from leaving
|
||||
user-configured grazing areas. The goal of the project is to
|
||||
provide a reliable, cost-effective, and accessible replacement
|
||||
for manual farmer labor.
|
||||
|
||||
\section{Current Project State}
|
||||
% TODO describe where you are currently on the project
|
||||
At present, the initial design of the project is complete. The project's structure
|
||||
lends itself very well to division among the three group members, and all
|
||||
team members' responsibilities have been explicitly defined and agreed upon.
|
||||
The team members all successfully researched the components of the project that
|
||||
they are responsible for, and their research has been incorporated into a thorough
|
||||
design document.
|
||||
|
||||
Both the technical reviews produced by the individual team members and the
|
||||
design document have been validated by the client, and there is consensus
|
||||
between the team and the client regarding future plans.
|
||||
|
||||
With the initial design complete, the project is ready to move into the
|
||||
implementation stage, with the exception of funding: once the department
|
||||
provides the team with funding required to purchase the hardware components
|
||||
specified in the design document, work can begin on implementing an initial
|
||||
prototype.
|
||||
|
||||
\section{Problems}
|
||||
One of the few problems we had this term was difficulty scheduling meetings in which all
|
||||
team members could meet with our client. As a result our interaction with our client was
|
||||
minimal at times, and resulted in only a few meetings over the course of the term. While
|
||||
this did not prove to be a significant blocker for our work, it did result in some necessary
|
||||
clarification recently with our client in regards to our vision on how we planned to move forward.
|
||||
We plan on fixing this problem by scheduling a biweekly meeting with our client at the beginning
|
||||
of next term. The best way to ensure that our team can keep our client up to date is to have a
|
||||
definite meeting time, and the best way to schedule this meeting would be as soon as all class
|
||||
schedules have been finalized.
|
||||
|
||||
Another problem we encountered was lack of funding. While this was not an issue at the
|
||||
beginning of the term, it is looking to be a serious blocker in the near future as our next step
|
||||
the moment we get back from winter break is to purchase hardware. Ideally, this hardware would be
|
||||
purchased prior to even returning to school to allow our team to start work on the physical
|
||||
aspect of our project immediately. Our client has approved our hardware proposal, which was the
|
||||
last step before purchasing. Our team has discussed this funding with our TA, who in turn has
|
||||
brought it up to Professors Winters and Fairbanks. In an effort to ensure funding will be secured
|
||||
as soon as possible, we will continue to follow up with our TA and the professors if necessary.
|
||||
|
||||
Our last small problem we came across was in regards to formatting for our different submissions.
|
||||
One of our documents was incorrectly formatted as a result of our misunderstanding of the
|
||||
requirements. Also, towards the beginning of the term we named our files incorrectly, resulting
|
||||
in the loss of points. In order to ensure that all style guidelines are met in the future, we
|
||||
will communicate with our TA, other students, and our professors as needed. Prior to asking
|
||||
others, we will peruse the online documents provided to us on Canvas to ensure that we are
|
||||
not asking questions that have already been answered.
|
||||
|
||||
\section{Weekly Progress}
|
||||
% TODO The document should include a detailed, week-by-week summary of activities,
|
||||
% problems, solutions, and the like (consider using your blogs to inform this report).
|
||||
% The report should not include more than a summary of any bigger documents you produced
|
||||
This section contains the summary of each week of the Fall term during which the
|
||||
project was active.
|
||||
|
||||
\subsection{Week 3}
|
||||
This was the first week during which we tracked progress. It consisted largely
|
||||
of drafting, submitting, and merging
|
||||
the requirements document and problem statements. This went smoothly; each team member
|
||||
felt confident in their understanding of the project's requirements and the
|
||||
problem it is solving, likely because our group was offered the project in
|
||||
the summer before the class had started. The only foreseeable problems at
|
||||
this point is the difficulty in scheduling a semi-regular meeting with the
|
||||
client: each group member, and the client themselves, are exceptionally
|
||||
busy during this academic term, and on most week, no single time works
|
||||
for every person. This problem is not significant at this point, however,
|
||||
because the team has enough information to work for the time being.
|
||||
|
||||
\emph{Note: At this point, some members of the team received lower scores
|
||||
than expected for certain submissions. Since the content of the various
|
||||
submissions was agreed upon by each team member, the variance in
|
||||
the received scores was unexpected and was listed as a "problem". However,
|
||||
this did not impact the project itself, since one of the submissions
|
||||
received full points.}
|
||||
|
||||
|
||||
\subsection{Week 4}
|
||||
This week consisted largely of revisions to the requirements document and
|
||||
independent research. Team roles have been decided as early as this week:
|
||||
each team member has a particular "strong suit", and will be playing
|
||||
to their strengths in implementing this project. Since team roles have
|
||||
been assigned, and since the team already has a vague understanding
|
||||
of what components the project will consist of, members are eager to purchase
|
||||
hardware and begin tinkering. However, a meeting has not yet been established
|
||||
with the client at this point, and the matter of funding has not yet been
|
||||
decided. It is not clear at this point who will be financing the hardware
|
||||
required for the project.
|
||||
|
||||
\subsection{Week 5}
|
||||
During this week, the source of funding was somewhat elucidated by a team
|
||||
member's individual meeting with the client. The team was informed
|
||||
that \$300 has been set aside for each Senior Capstone team to help with funding.
|
||||
The team's TA was asked about this, but was not aware of the details, and
|
||||
offered to contact Dr. Winters.
|
||||
|
||||
While there is not yet an exact date for a meeting with the client, one
|
||||
is soon to be established. Each group member and the client provided the
|
||||
times during which they are available, revealing that there were no
|
||||
time slots during which each individual was available to meet. As such,
|
||||
one of the group members will likely skip this meeting, and the rest
|
||||
of the group members will fill them in.
|
||||
|
||||
In preparation for the client meeting, team members have been doing further
|
||||
research into their components of the project. This coincides well with the
|
||||
first drafts of the technical review, which require exactly the type of
|
||||
research that the team will present to the client in the meeting.
|
||||
|
||||
\subsection{Week 6}
|
||||
The highlight of this week was the first meeting with the client. This meeting
|
||||
was scheduled last-minute, but went very well. The team's plan and the client's
|
||||
expectations were not significantly different.
|
||||
|
||||
\section{Retrospective}
|
||||
% TODO add retrospective
|
||||
% positives column: anything good that happened
|
||||
% deltas column: changes that need to be implemented
|
||||
% actions column: specific actions that will be implemented in order to create the necessary changes
|
||||
\begin{tabular*}{\linewidth}{@{\extracolsep{\fill}}|p{0.3\linewidth}|p{0.3\linewidth}|p{0.3\linewidth}|@{}}
|
||||
\hline
|
||||
|
||||
Positives & Deltas & Actions \\
|
||||
\hline
|
||||
\begin{itemize}
|
||||
\item one
|
||||
\end{itemize}
|
||||
&
|
||||
\begin{itemize}
|
||||
\item two
|
||||
\end{itemize}
|
||||
&
|
||||
\begin{itemize}
|
||||
\item three
|
||||
\end{itemize} \\
|
||||
|
||||
\end{tabular*}
|
||||
|
||||
\end{document}
|
Loading…
Reference in New Issue
Block a user