This commit is contained in:
RyanAlder 2019-10-17 12:04:10 -07:00
parent 482997190f
commit 2cd4d2d2e7
1 changed files with 14 additions and 16 deletions

View File

@ -120,8 +120,6 @@ and usually directs traffic to another server or the wider internet.
\subsubsection{LoRa End-node} \subsubsection{LoRa End-node}
The LoRa end-node refers to each node running the LoRa and LoRaWAN protocol. In this The LoRa end-node refers to each node running the LoRa and LoRaWAN protocol. In this
project, each collar will be an end-node. project, each collar will be an end-node.
\section{References}
?? \todo{Do we need this?}
\section{System requirements} \section{System requirements}
\subsection{Functional requirements} \subsection{Functional requirements}
\subsubsection{GPS} \subsubsection{GPS}
@ -230,8 +228,8 @@ LoRa chip, and LoRa gateway(s) will be configured based on the desired
number of operational collars. LoRaWAN will be configured and implemented number of operational collars. LoRaWAN will be configured and implemented
for communication with the end nodes and the server. for communication with the end nodes and the server.
\subsection{System operations} %\subsection{System operations}
\todo{this?} %\todo{this?}
\subsection{System modes and states} \subsection{System modes and states}
Besides the "standard" operational mode for the collar, it Besides the "standard" operational mode for the collar, it
is useful to envision other modes that help in troubleshooting is useful to envision other modes that help in troubleshooting
@ -278,18 +276,18 @@ throughout the year must be considered. The collars must be able to constantly o
temperatures below freezing during the winter, and temperatures in excess of 100 degrees temperatures below freezing during the winter, and temperatures in excess of 100 degrees
fahrenheit during the summer. fahrenheit during the summer.
\subsection{System security} %\subsection{System security}
\todo{Do we need this?} %\todo{Do we need this?}
\subsection{Information management} %\subsection{Information management}
\todo{Do we need this?} %\todo{Do we need this?}
\subsection{Policies and regulations} %\subsection{Policies and regulations}
\todo{Do we need this?} %\todo{Do we need this?}
\subsection{System life cycle sustainment} %\subsection{System life cycle sustainment}
\todo{Do we need this?} %\todo{Do we need this?}
\subsection{Packaging, handling, shipping and transportation} %\subsection{Packaging, handling, shipping and transportation}
\todo{Do we need this?} %\todo{Do we need this?}
\section{Verification} %\section{Verification}
\todo{Someone else please} %\todo{Someone else please}
\section{Gantt Chart} \section{Gantt Chart}
\begin{changemargin}{-2cm}{0cm} \begin{changemargin}{-2cm}{0cm}