Fix typos

This commit is contained in:
Danila Fedorin 2019-12-06 21:23:02 -08:00
parent f1b609dd60
commit 0d6846f55e
1 changed files with 4 additions and 4 deletions

View File

@ -188,7 +188,7 @@ research that the team will present to the client in the meeting.
\subsection{Week 6}
The highlight of this week was the first meeting with the client. This meeting
was scheduled last-minute, but went very well. The team's plan and the client's
expectations were not significantly different. To accomodate the team and
expectations were not significantly different. To accommodate the team and
the client's busy schedule, meetings were agreed to be bi-weekly, and made
optional (to prevent wasted time in the event that no new information is
required by the group). During this week, team members wanted to begin
@ -208,7 +208,7 @@ in the second draft. The first draft was submitted on time and with no other iss
Since the team was busy with the creation of the design (and the design document),
the issue of funding was not significant at this time. The group member responsible
for the hardware simulated some of the components of the initial design, in order
for the hardware simulated some components of the initial design, in order
to explore the implementation of the project. However, no significant insight
was gained from this, with the exception of familiarity with the tooling.
@ -224,11 +224,11 @@ of the document, which were promptly corrected. At this point, the document was
complete with the exception of UML diagrams, which were scheduled to be inserted
during the weekened.
Other than the medical emergency and the design document, no significant problems
or progress occured this week.
or progress occurred this week.
\subsection{Week 9}
This was a short week which ended in Thanksgiving, and no significant changes
to the state of the project occured at this time. The team submitted all the
to the state of the project occurred at this time. The team submitted all the
generated documentation to the client / advisor, but did not receive a
response during this week. No issues were encountered during this time.