@ -188,7 +188,7 @@ research that the team will present to the client in the meeting.
|
|||||||
\subsection{Week 6}
|
\subsection{Week 6}
|
||||||
The highlight of this week was the first meeting with the client. This meeting
|
The highlight of this week was the first meeting with the client. This meeting
|
||||||
was scheduled last-minute, but went very well. The team's plan and the client's
|
was scheduled last-minute, but went very well. The team's plan and the client's
|
||||||
expectations were not significantly different. To accomodate the team and
|
expectations were not significantly different. To accommodate the team and
|
||||||
the client's busy schedule, meetings were agreed to be bi-weekly, and made
|
the client's busy schedule, meetings were agreed to be bi-weekly, and made
|
||||||
optional (to prevent wasted time in the event that no new information is
|
optional (to prevent wasted time in the event that no new information is
|
||||||
required by the group). During this week, team members wanted to begin
|
required by the group). During this week, team members wanted to begin
|
||||||
@ -208,7 +208,7 @@ in the second draft. The first draft was submitted on time and with no other iss
|
|||||||
|
|
||||||
Since the team was busy with the creation of the design (and the design document),
|
Since the team was busy with the creation of the design (and the design document),
|
||||||
the issue of funding was not significant at this time. The group member responsible
|
the issue of funding was not significant at this time. The group member responsible
|
||||||
for the hardware simulated some of the components of the initial design, in order
|
for the hardware simulated some components of the initial design, in order
|
||||||
to explore the implementation of the project. However, no significant insight
|
to explore the implementation of the project. However, no significant insight
|
||||||
was gained from this, with the exception of familiarity with the tooling.
|
was gained from this, with the exception of familiarity with the tooling.
|
||||||
|
|
||||||
@ -224,11 +224,11 @@ of the document, which were promptly corrected. At this point, the document was
|
|||||||
complete with the exception of UML diagrams, which were scheduled to be inserted
|
complete with the exception of UML diagrams, which were scheduled to be inserted
|
||||||
during the weekened.
|
during the weekened.
|
||||||
Other than the medical emergency and the design document, no significant problems
|
Other than the medical emergency and the design document, no significant problems
|
||||||
or progress occured this week.
|
or progress occurred this week.
|
||||||
|
|
||||||
\subsection{Week 9}
|
\subsection{Week 9}
|
||||||
This was a short week which ended in Thanksgiving, and no significant changes
|
This was a short week which ended in Thanksgiving, and no significant changes
|
||||||
to the state of the project occured at this time. The team submitted all the
|
to the state of the project occurred at this time. The team submitted all the
|
||||||
generated documentation to the client / advisor, but did not receive a
|
generated documentation to the client / advisor, but did not receive a
|
||||||
response during this week. No issues were encountered during this time.
|
response during this week. No issues were encountered during this time.
|
||||||
|
|
||||||
|